Research on rock-breaking effect of TBM hob and application of new type cutter

Yingchao Liu1,2Bo Liu2,3()Yusheng Jiang2Hua Jiang2Ting Li2
China Architecture Publishing & Media Co., Ltd., Beijing 100037
School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijing, Beijing 100083
State Key Laboratory for Geomechanics and Deep Underground Engineering, Beijing 100083
Show Author Information

Abstract

TBM hob wear is an important factor that affects the TBM tunneling efficiency and construction cost.Different blade types differ in rock breaking efficiency and wear.By analyzing the rock-breaking mechanism of the arc blade wedged hob, this study established the calculation model of hob normal cutting, and analyzed the influence of hob edge angle on normal cutting force.This study then designed three kinds of hobs with different cutter spacing and three types of hobs with different blade for rock breaking tests in laboratory.Results show that the reasonable cutter spacing is 15mm, sharp blade is prone to be worn, the tooth-like blade, which has higher rock breaking efficiency and wear resistance, is better than arc blade.Combined with the actual situation of the project site, a new hob with wedge-shaped blade is developed, which are applied to inclined shaft TBM tunneling at engineering site.Results show that the wear rate of the new wedge-shaped hob is 20 % less than that of the conventional ones, and the service life of former is longer than that of latter.Under the same geological conditions, new wedge-shaped hob can reduce the number of hobs consumption and improve efficiency of tunnelling.The development and application of the new type successfully solved the problems of hob wear and frequent replacement of hobs in the TBM inclined shaft excavation.It can provide technical support for TBM long distance inclined shaft driving, which not only shortened the construction period, but also saved the construction cost.

CLC number: TU455 Document code: A Article ID: 2096-2193(2023)03-0357-13

References

[1]

Hansen A. Boreability testing, in Norwegian TBM tunnelling, chapter 2[M]. Trondheim: Norwegian Tunnelling Society, 1998: 21-26.

[2]

Wang Xu, Zhao Yu, Zhang Baogang, et al. Research on the ring wear mechanism of TBM disc cutter[J]. Modern Tunnelling Technology, 2010, 47(5): 15-19.

[4]

Wang Xu, Li Xiao, Liao Qiulin. A review of rock boreability testing for TBM tunnelling[J]. Chinese Journal of Underground Space and Engineering, 2009, 5(1): 67-73.

[5]

Zhu Heyi, Yang Yandong, Chen Kui. Breaking force derivation and wear rate forecast of shield disc cutters[J]. Modern Tunnelling Technology, 2016, 53(5): 131-136, 144.

[6]

Zhang Houmei. Research on relationship between TBM disc cutter abrasion and disc cutter slipping distance[J]. Tunnel Construction, 2017, 37(3): 369-374.

[7]

Du Zhiguo, Gong Yadong. Research on the wear of TBM disc cutters based on the arc of the rock breakage[J]. Construction Machinery, 2012(9): 73-76.

[8]

Zhang Zhaohuang. Study on the abrasion of disc cutters on full face rock tunnel boring machine[J]. Modern Tunnelling Technology, 2007, 44(6): 32-36.

[9]

Liu Hailong, Qu Chuanyong, Qin Qinghua. Experimental investigation on skimming wear mechanism between TBM cutter ring and rock[J]. Journal of Experimental Mechanics, 2015, 30(3): 289-298.

[10]

Wang He, Wu Yuhou, Sun Jian, et al. Analysis and experimental research on rock breaking test bed with double disc cutters[J]. Machinery Design & Manufacture, 2017(1): 182-185.

[11]

Gong Qiuming, Dong Guiliang, Yin Lijun, et al. Comparison study on the rock linear and rotating cutting test by TBM cutter[J]. Construction Technology, 2017, 46(11): 61-66.

[12]

Chang S H, Choi S W, Bae G J, et al. Performance prediction of TBM disc cutting on granitic rock by the linear cutting test[J]. Tunnelling and Underground Space Technology, 2006, 21(3/4): 271.

[13]

Wang H, Wu Y H, Sun H, et al. Analysis of rock comprehensive test bed with double disc cutters[J]. Advanced Science Letters, 2011, 4(8): 2747-2751.

[14]

Liu B, Li T, Han Y H, et al. DEM-continuum mechanics coupling simulation of cutting reinforced concrete pile by shield machine[J]. Computers and Geotechnics, 2022, 152: 105036.

[15]

Su Lijun, Sun Jinshan, Lu Wenbo. Research on numerical simulation of rock fragmentation by TBM cutters using particle flow method[J]. Rock and Soil Mechanics, 2009, 30(9): 2823-2829.

[16]

Tan Qing, Li Jianfang, Xia Yimin, et al. Numerical research on rock fragmentation process by disc cutter[J]. Rock and Soil Mechanics, 2013, 34(9): 2707-2714.

[17]

Liu B, Li T, Chang W, et al. Mechanical response of horseshoe-shaped tunnel lining to undercrossing construction of a new subway station[J]. Tunnelling and Underground Space Technology, 2022, 128: 104652.

[18]

Li T, Zhang Z Y, Jia C T, et al. Investigating the cutting force of disc cutter in multi-cutter rotary cutting of sandstone: Simulations and experiments[J]. International Journal of Rock Mechanics and Mining Sciences, 2022, 152: 105069.

[19]

Liu Gaofeng, Song Tiantian. Analysis and study on wearing of cutting tools of shield machines used in Chengdu metro construction[J]. Tunnel Construction, 2007, 27(6): 89-93.

[20]

Liu B, Yu Z W, Zhang R H, et al. Effects of undercrossing tunneling on existing shield tunnels[J]. International Journal of Geomechanics, 2021, 21(8): 04021131.

[21]

Yang Yandong, Chen Kui, Guo Lu, et al. Analysis of influencing factors of wear of disc cutter of full-face hard rock tunnel boring machine[J]. Tunnel Construction, 2016, 36(11): 1394-1400.

[22]

Jin Yanqiu, Liu Zhihua, Yang Liang, et al. Analyzing the cause of TBM disc cutter worn in Tao River diversion project No. 9 tunnel[J]. Construction Mechanization, 2011, 32(6): 79-81.

[24]

Zhang Zhaohuang. Present situation and analysis of theoretical research on interaction between disc hob and rock (2)[J]. Construction Machinery and Equipment, 2009, 40(10): 18-22.

[26]

Zhang Biao, Zhang Zhiqiang, Sun Fei, et al. Study on rock cutting sequentially by TBM disc cutter based on three-dimensional particle flow model[J]. China Railway Science, 2017, 38(4): 70-76.

Journal of Mining Science and Technology
Pages 357-369
Cite this article:
Liu Y, Liu B, Jiang Y, et al. Research on rock-breaking effect of TBM hob and application of new type cutter. Journal of Mining Science and Technology, 2023, 8(3): 357-369. https://doi.org/10.19606/j.cnki.jmst.2023.03.009