35 | Chang et al., 2014 | Integrated production and distribution | | Mixed Integer Linear Programming (MILP) | Delivery time, distribution cost | SI/EA |
36 | Gharaei and Jolai, 2018 | Integrated scheduling and distribution | | Mixed Linear Programming (MIP) | Tardiness, distribution cost | SH/DR, SI/EA |
37 | Marandi an Fatemi, 2019 | Production and distribution scheduling | | MIP | Makespan | SI/EA, CPLEX |
38 | Mishra et al., 2012 | Planning | Supply chain environment | General mathematical model | Cost, machining time | SI/EA |
39 | Zhang et al., 2017 | Integration planning and scheduling | | General mathematical model | Makespan | SI/EA |
40 | Ribas et al., 2017 | Flowshop | Blocking | General mathematical model | Makespan | SI/EA |
41 | Dong and Ye, 2019 | Semiconductor wafer manufacturing | | MIP | Makespan, carbon emissions, tardiness | SH/DR, SI/EA |
42 | Xiong et al., 2014 | Flowshop | Two-stage assembly line, setup time | General mathematical model | Total flow time | SI/EA |
43 | Behnamian, 2014 | General manufacturing environment | Transportation time | MILP | Cost and profit | CPLEX, SI/EA |
44 | Zhang et al., 2016 | Job shop | Fuzzy processing time | General mathematical model | Makespan | SI/EA |
45 | Neira et al., 2017 | Flowshop | Assembly line, stochastic processing time | None | Makespan | Others |
46 | Fu et al., 2019 | Distributed manufacturing system | Stochastic | MIP | Total tardiness, energy consumption | SI/EA |
47 | Shao et al., 2019 | Flowshop | Blocking | General mathematical model | Makespan | SI/EA |
48 | Li et al., 2020 | Hybrid flowshop | Heterogeneous, setup time | MILP | Makespan | SI/EA |
49 | Ying et al., 2020 | Flowshop | Flexible assembly, sequence-independent setup time | MILP | Makespan | SI/EA |
50 | Zheng et al., 2020 | Flowshop | Fuzzy processing time | General mathematical model | Fuzzy tardiness and robustness | SH/DR, SI/EA |
51 | Song and Lin, 2020 | Flowshop | Assembly, setup time | MILP | Makespan | SI/EA |
52 | Li et al., 2021 | Flowshop | No-wait | General mathematical model | Makespan | SI/EA |
53 | Komaki and Malakooti, 2017 | Flowshop | No-wait | General mathematical model | Makespan | SI/EA |
54 | Ying et al., 2017 | Flowshop | No-idle | MIP | Makespan | SI/EA |
55 | Ying and Lin, 2017 | Flowshop | Blocking | MIP | Makespan | SI/EA |
56 | Shao et al., 2017 | Flowshop | No-wait | General mathematical model | Makespan | SH/DR, SI/EA |
57 | Cheng et al., 2019 | Flowshop | No-idle | MILP | Makespan | SI/EA |
58 | Zhang et al., 2018 | Flowshop | Blocking | General mathematical model | Makespan | SH/DR, SI/EA |
59 | Ribas et al., 2019 | Flowshop | Blocking | None | Total tardiness | SI/EA |
60 | Chen et al., 2019 | Flowshop | No-idle | General mathematical model | Makespan, total energy consumption | SI/EA |
61 | Zhao et al., 2020 | Flowshop | Blocking | General mathematical model | Makespan | SI/EA |
62 | Zhao et al., 2020 | Flowshop | No-idle | None | Assembly, completion time | SI/EA |
63 | Shao et al., 2020 | Flowshop | Blocking | MILP | Makespan | SI/EA |
64 | Hatami et al., 2013 | Flowshop | Assembly line | MILP | Makespan | SH/DR, SI/EA |
65 | S. Y. Wang and L. Wang, 2015 | Flowshop | Assembly line | General mathematical model | Makespan | SI/EA |
66 | Deng et al., 2016 | Flowshop | Two-stage assembly line | MILP | Makespan | SI/EA |
67 | Lin and Zhang, 2016 | Flowshop | Assembly line | General mathematical model | Makespan | SI/EA |
68 | Lin et al., 2017 | Flowshop | Assembly line | General mathematical model | Makespan | SH/DR, SI/EA |
69 | Zhang and Xing, 2018 | Flowshop | Two-stage assembly line | General mathematical model | Total flow time | SI/EA |
70 | Wu et al., 2019 | Flexible Job Shop Scheduling (FJSP) | Assembly line | General mathematical model | Earliness/tardiness, total cost | SI/EA |
71 | Zhang et al., 2020 | Flowshop | Flexible assembly line | MILP | Makespan | SI/EA |
72 | Lei et al., 2020 | Flowshop | Two-stage assembly flow shop | General mathematical model | Makespan | SI/EA |
73 | Rifai et al., 2016 | Flowshop | Reentrant | General mathematical model | Makespan, cost, and tardiness | SI/EA |
74 | Lei et al., 2020 | Parallel machine scheduling | Unrelated parallel machines | General mathematical model | Makespan | SI/EA |
75 | Meng and Pan, 2020 | Flowshop | Heterogeneous, lot-streaming, setup time | MILP | Makespan | SH/DR, SI/EA |
76 | Naderi and Ruiz, 2010 | Flowshop | | MILP | Makespan | SH/DR |
77 | Azab and Naden, 2014 | Job shop | | MILP | Makespan | SH/DR, CPLEX |
78 | Naderi and Azab, 2015 | Job shop | | MILP | Makespan | SI/EA |
79 | Behnamian and Ghomi, 2015 | General manufacuring environment | | MILP | Total completion time | SH/DR, CPLEX |
80 | Ying and Lin, 2018 | Flowshop | Multiprocessor tasks | MILP | Makespan | SI/EA |
81 | Shao et al., 2019 | Flowshop | No-wait, setup time | MILP | Makespan, total weight tardiness | SH/DR, SI/EA |
82 | Pan et al., 2019 | Flowshop | | MIP | Makespan | SI/EA |
83 | Huang et al., 2020 | Flowshop | Sequence-dependent setup time | MILP | Makespan | SI/EA |
84 | Meng et al., 2020 | FJSP | | MILP, constraint programming | Makespan | CPLEX |
85 | Gong et al., 2020 | General manufacturing environment | | MILP | Makespan, total energy consumption | SH/DR, SI/EA |
86 | Lu et al., 2020 | Flowshop | | MILP | Makespan, total energy consumption | SI/EA |
87 | Wang et al., 2020 | Flowshop | | MILP | Makespan, energy consumption | SI/EA |
88 | Pan et al., 2020 | Flowshop | Group scheduling | MILP | Makespan | SI/EA |
89 | Xiong et al., 2020 | Flowshop | Concrete precast | MINLP, MILP | Total weighted earliness and tardiness | SI/EA |
90 | J. Wang and L. Wang, 2018 | Flowshop | | General mathematical model | Makespan, total energy consumption | SH/DR, SI/EA |
91 | Fu et al., 2019 | Flowshop | Total tardiness threthold | Chance-constrained programming | Makespan, energy consumption | SI/EA |
92 | Luo et al., 2020 | FJSP | Transfer | General mathematical model | Makespan, workload, energy consumption | SI/EA |
93 | Jiang et al., 2020 | FJSP | | General mathematical model | Makespan, energy consumption | SI/EA |
94 | Guo et al., 2015 | General manufacturing environment | Production monitoring | Intelligent decision support system | Tracking and monitoring | Others |
95 | Zou et al., 2018 | Integrated scheduling and vehicle routing | | General mathematical model | Maximum route time | SH/DR, SI/EA |
96 | Zhang and Gen, 2010 | Distributed manufacturing system | | General mathematical model | Total processing time, workload | SI/EA |
97 | Giovanni and Pezzella, 2010 | FJSP | | General mathematical model | Makespan | SI/EA |
98 | Gao and Chen, 2011 | Flowshop | | General mathematical model | Makespan | SH/DR, SI/EA |
99 | Liu et al., 2014 | FJSP | Fastener manufacturer | General mathematical model | Makespan | SI/EA |
100 | Chang and Liu, 2017 | FJSP | | General mathematical model | Makespan | SI/EA |
101 | Wu et al., 2017 | FJSP | | | None | SI/EA |
102 | Viagas et al., 2018 | Flowshop | | General mathematical model | Total flow time | SH/DR, SI/EA, lower bounds |
103 | Lu et al., 2018 | FJSP | | General mathematical model | Makespan | SI/EA |
104 | Cai et al., 2018 | Flowshop | Transportation and eligibility | General mathematical model | Makespan, lateness, cost | SH/DR, SI/EA |
105 | Wang et al., 2013 | Flowshop | | General mathematical model | Makespan | SH/DR, SI/EA |
106 | Xu et al., 2014 | Flowshop | | General mathematical model | Makespan | |
107 | Zhang et al., 2018 | Flowshop | | General mathematical model | Makespan | SI/EA |
108 | Meng et al., 2019 | Flowshop | | General mathematical model | Makespan | SI/EA |
109 | Yang and Xu, 2020 | Flowshop | Flexible assembly and batch delivery | General mathematical model | Total cost, tardiness | SI/EA |
110 | Gao et al., 2013 | Flowshop | | General mathematical model | Makespan | SI/EA |
111 | Li et al., 2018 | FJSP | | General mathematical model | Makespan, maximal workload, and earliness/tardiness | SH/DR, SI/EA |
112 | Chaouch et al., 2017 | Job shop | | Disjunctive graph | Makespan | SI/EA |
113 | Zhang and Xing, 2019 | Flowshop | Limited-buffer | General mathematical model | Makespan | SH/DR, SI/EA |
114 | Naderi and Ruiz, 2014 | Flowshop | | General mathematical model | Makespan | SI/EA |
115 | Pan et al., 2019 | Flowshop | | General mathematical model | Total flow time | SH/DR, SI/EA |
116 | Lin et al., 2013 | Flowshop | | General mathematical model | Makespan | SH/DR, SI/EA |
117 | Viagas and Framinan, 2015 | Flowshop | | General mathematical model | Makespan | |
118 | Ruiz et al., 2019 | Flowshop | | General mathematical model | Makespan | SH/DR, SI/EA |
119 | Shao et al., 2020 | Hybrid flowshop | | General mathematical model | Makespan | SH/DR, SI/EA |
120 | Mao et al., 2020 | Flowshop | Preventive maintenance | General mathematical model | Makespan | SI/EA |
121 | Deng and Wang, 2017 | Flowshop | | General mathematical model | Makespan, total tardiness | SI/EA |
122 | J. Wang and L. Wang, 2020 | Flowshop | | General mathematical model | Makespan | SI/EA |
123 | Bargaoui et al., 2017 | Flowshop | | None | Makespan | SI/EA |
124 | Zhang et al., 2017 | Distributed manufacturing resource allocation | | General mathematical model | Operating time, cost, risk, and quality | SI/EA |
125 | Hao et al., 2019 | Hybrid flowshop | | General mathematical model | Makespan | SI/EA |
126 | Li et al., 2019 | Flowshop | Parallel batching, deteriorating jobs | General mathematical model | Makespan | SH/DR, SI/EA |
127 | Li et al., 2019 | Flowshop | Distance coefficient | General mathematical model | Makespan | SH/DR, SI/EA |
128 | Huang et al., 2020 | Flowshop | Sequence-dependent setup time | General mathematical model | Makespan | SI/EA |
129 | Lei and Wang, 2019 | Hybrid flowshop | Two-stage flow shop | General mathematical model | Makespan | SI/EA |
130 | Cai et al., 2020 | Hybrid flowshop | | General mathematical model | Makespan, total tardiness | SI/EA |
131 | Sang et al., 2019 | Flowshop | | General mathematical model | Total flow time | SI/EA |