Remanufacturing is regarded as a sustainable manufacturing paradigm of energy conservation and environment protection. To improve the efficiency of the remanufacturing process, this work investigates an integrated scheduling problem for disassembly and reprocessing in a remanufacturing process, where product structures and uncertainty are taken into account. First, a stochastic programming model is developed to minimize the maximum completion time (makespan). Second, a Q-learning based hybrid meta-heuristic (Q-HMH) is specially devised. In each iteration, a Q-learning method is employed to adaptively choose a premium algorithm from four candidate ones, including genetic algorithm (GA), artificial bee colony (ABC), shuffled frog-leaping algorithm (SFLA), and simulated annealing (SA) methods. At last, simulation experiments are carried out by using sixteen instances with different scales, and three state-of-the-art algorithms in literature and an exact solver CPLEX are chosen for comparisons. By analyzing the results with the average relative percentage deviation (RPD) metric, we find that Q-HMH outperforms its rivals by 9.79%−26.76%. The results and comparisons verify the excellent competitiveness of Q-HMH for solving the concerned problems.
Publications
- Article type
- Year
- Co-author
Year
Open Access
Issue
Complex System Modeling and Simulation 2024, 4(2): 184-209
Published: 30 June 2024
Downloads:35
Total 1